Place de l'Europe > rue Adrienne Bolland
At the level of Rue Saint-Sébastien and Rue Adrienne Bolland, the SNCF will carry out work on the side of Rue Adrienne Bolland between January and August 2025.
At the level of Rue Saint-Sébastien and Rue Adrienne Bolland, the SNCF will carry out work on the side of Rue Adrienne Bolland between January and August 2025.