ExtensionParisian Garden > Clamart Station
How long will it take to connect between the terminus of the future T10 tram and the station of the future metro line 15?
Published on
At the preliminary consultation stage, the projected connection time was approximately 5 minutes. The feasibility of an underground connection between the T10 and line 15 to reduce this connection time is currently being studied.