Choosing cookies

We use statistical trackers to monitor and improve the quality of the site. In accordance with the regulations in force, this data collected is anonymised. You can accept the use of these trackers by ticking the corresponding boxes or block them by unchecking them.

  • Home page
  • ...
    • Network Map
    • Projects and engineering works
  • Tram T10 – Prolongement à Gare de Clamart
  • Your questions
Tram

ExtensionParisian Garden > Clamart Station

Accueil
Discover the project
Dialogue
News
Media library
Your questions

Your questions

You can always contribute and ask your questions via the contact box below! Île-de-France Mobilités undertakes to regularly publish on the website the answers that may be provided during the consultation.
Ask a question

  • Why was the above-ground scenario not retained at the end of the preliminary consultation?
  • How was the connection with line N and the future line 15 of the metro designed?
  • What are the terms of construction of the tunnel?
  • How are the potential locations of the stations chosen?
  • What are the next steps in the consultation?
    • What are the main objectives of the T1 0 Tram extension project?
    • What is the route and length of the scenario envisaged?
    • What is the cost of the project and how is it financed?
    • How would the extension of the T10 tram complete the local public transport network?
    • How long will it take to connect between the terminus of the future T10 tram and the station of the future metro line 15?
    • What is the overall cost of the work?
    • What are the terms of construction of the tunnel?
    • Is it possible to start the descent of the tramway towards the entrance of the tunnel from the RD906 bridge by taking advantage of the passage under the hopper in order to limit nuisance?
    • How are the land needs identified to carry out the operation?
    • How are the potential locations of the stations chosen?
    • The "Mairie" and "Centre-ville" stations are very close. Why this choice?
    • Why is a rear station necessary at the Gare de Clamart terminus?
    • How deep will the tunnel be in the station district?
    • What is planned if defects are observed following the passage of the tunnel boring machine?
    • What would be the size and location of the rear station?
    • How will the location of the annex structure between the city centre and the station be chosen?
    • Where would the necessary ancillary structure be located between the "Centre" and "Gare" stations?
    • In the case of a twin-tube tunnel, would the ancillary structures towards the centre and the Clamart station be removed?
    • How was the connection with line N and the future line 15 of the metro designed?
    • Why not set up the ancillary structures in the public space rather than considering expropriations?
    • How will land acquisitions be made?
    • Will there be any nuisance (noise, vibrations) during the operation of the tramway and line 15, especially for properties near these 2 lines?
    • What is the estimated attendance of the extended T10?
    • Why was the above-ground scenario not retained at the end of the preliminary consultation?
    • How are careers in the sector taken into account?
    • Will there be expropriations of the depths?
    • Is the T10 tram on rails or wheels?
    • What is the status of the consultation?
    • What are the next steps in the consultation?
    • What is the study process and how does it lead to the project brought to the public inquiry?
    • How to get around between the town hall sectors of Clamart and Béclère during the landfill work?
    • How are you going to take into account the traffic in the district and ensure that buses and road traffic are maintained?
    • Will there be any nuisance (noise, vibrations, deterioration of houses) during the work on the tunnel boring machine and the construction of the structures?
    • How long will the work take?
    • How will heavy goods vehicles be used to carry out the work?

This site uses cookies.

Ile-de-France Mobilités stores information about you via the deposit of cookies in order to measure the site's audience. This browsing data is anonymised. A Youtube cookie is also set to allow you to play Youtube videos on the site.

By clicking on "I agree", you are giving your consent to the deposit of these cookies.
By clicking on "I choose", you can customize your choices.
By clicking on "I refuse" or by continuing browsing, you indicate your refusal to the deposit of the Youtube cookie. This denial prevents you from playing Youtube videos.

Learn more