Tram

ExtensionParisian Garden > Clamart Station

How deep will the tunnel be in the station district?

Published on

The preferred solution at this stage is to plan the arrival of the T10 tunnel at the same altimetry as line 15, i.e. at a depth of about 20m, in order to be able to optimise the connection between the two lines. This high level of depth limits the risk of interfaces with buildings on the surface.