New lineMassy > Évry-Courcouronnes
The work on the workshop-garage in pictures (summer 2018)
Published on
- Formwork of the tracks above the pit in the maintenance workshop.
- Construction of the administrative part.
- Reinforcement of the tracks on the workshop's pit before pouring concrete.
- Installation of a wooden floor in the administrative part.
- Installation of a wooden pole on the administrative building.
- Maintenance workshop: concrete structure (beams and columns).
- Additional earthworks along the tracks above the pit.
- Overview of the administration building and maintenance workshop.
- Entrance to the administrative building.