New lineMassy > Évry-Courcouronnes
Media library
- The project timeline
- The future T12 tram in pictures
- A look back at the construction of the underpass in Petit Vaux
- Go behind the scenes of the workshop-garage
- A look back at the laying of the first rails (November 2020)
- Live from the construction of the bridge over the RD77, in Morsang-sur-Orge
- A look back at the development work on RER stations (summer 2020)
- The work on the workshop-garage in pictures (summer 2018)
- The launch of the bridges in Grigny and Ris-Orangis in pictures
- The works in Grigny, Ris-Orangis and Morsang-sur-Orge (July 2019)
- Work on the track beam in Massy in pictures (January 2019)
- A look back at the open days of the construction site in Grigny (12 October 2019)
- Works in pictures (summer 2018)
- Live from the launch of the Évry-Courcouronnes bridge (June-July 2020)
- The T12 tram jobs
- Videos of the T12 tram
- The floor of