To allow the T7 tram to circulate in the centre of the RN7, urban development work is necessary to the east of the RN7.

Where?
Between the Pyramide crossroads and Rue Petit.

When?
2 phases of work, Monday to Friday, between 7 a.m. and 7 p.m.:
- Phase 1: from June 15 to September 2026,
- Phase 2: from September to October 2026.

What does the work involve?
• Installation of new curbs, construction of temporary and permanent roads.
• Preparation of the tram platform.

What impacts?For pedestrians:
• Pedestrian paths are maintained.
• Access to neighbouring homes, shops and car park entrances is maintained (temporary closures possible with return each evening).

For the road axis:
• Both lanes of traffic will be maintained in both directions throughout the work.
Phase 1: Dead-end of Rue Alexandre Dumas and Rue Camille Flammarion.
Phase 2: Dead-end of Rue Claude Bernard and Rue de l'Observatoire.

For parking:
• Some parking spaces are removed along the RN7.

For buses: Phase 1:
• Bus 486 to Porte de l'Essonne: diversion via Av. de la Terrasse, Av Raspail and Rue de l'Observatoire. The "Hôpital", "Piver" and "Mairie" stops are not served. New stop "Parc des Grottes".
• Bus 385 to Épinay-sur-Orge: diversion via Rue de l'Observatoire. The "Thiers" stop is not served.

Phase 2 :
• Bus 486 to Porte de l'Essonne: diversion via the RN7, Pyramide crossroads and Route de Montlhéry. The "École Jean Jaurès" stop is not served. Temporary stops will be set up on the RN7 and the Route de Montlhéry (more info to come).