The project
The extension project for metro line 1 aims to serve 3 new stations over nearly 5 km:
- A first Les Rigollots* station, in Fontenay-sous-Bois,
- A Grands Pêchers* intermediate station, in Montreuil,
- And a terminus station Val de Fontenay*, in Fontenay-sous-Bois.
*Station names are provisional.
The modalities of integration of the stations and their access will be re-studied as part of the resumption of studies.
The objectives of the project
Améliorer l’accès aux pôles d’emploi, d’études et aux grands équipements de la Région
Favoriser le report modal et offrir une alternative fiable et confortable à la voiture individuelle pour les déplacements
Accompagner le développement des territoires desservis
The benefits of the project
The extension of line 1 will offer users of the districts served a fast link to Paris and Val de Fontenay thanks to a fully automated metro line. It will also promote a better connection with the new transport lines in Val de Fontenay, strengthening the network of transport in the Ile-de-France region.
Construction methods
The work on a metro tunnel is mainly carried out underground, most often with the use of a tunnel boring machine; and occasionally from the surface (in cut-and-cover when possible) for stations, ancillary structures, the train breakdown centre. The connection to the rear station of Château de Vincennes must be made partly from the surface and partly underground.