SubwayLine 1

ExtensionChâteau de Vincennes < > Val de Fontenay

Opinions published

Advice received

Published on

|Montreuil

Avis sur le projet

Route n°1 really concerns the most disadvantaged in terms of transport and concerns the most people

Published on

|Fontenay-sous-Bois

Voeu de l'association Fontenay Vélo

On the proposal of Monique Abraham, president of "Métro Rigollots - Val de Fontenay" and member of Fontenay vélo, The General Assembly of Fontenay vélo, which met on Saturday 22 November 2014, unanimo

Published on

|Fontenay-sous-Bois

ligne1

I support this project because I think it will lighten the ReR line A. As for the route, I prefer route 3 passing through Verdun, route 1 being in a large part parallel to the tramway route

Published on

|Fontenay-sous-Bois

Tracé 1

Route 1 (large peach trees) seems to me to be the most judicious because it serves the larger population

Published on

|Montreuil

Un tracé par le haut Montreuil

I have heard of a hypothetical route for the top of Montreuil and, a totally deserted area, where the great number of passengers take crowded buses to take the 9, or go to Fontenay... A LINE through t

Published on

|Fontenay-sous-Bois

Tracés 1 &amp; 2 : risques mouvement terrain –impacts sur les habitations sur les tracés

Detailed soil and subsoil studies have been carried out concerning the risks of ground movements that could be induced by routes 1 and 2, knowing that they pass through an area (the plateau) which, to

Published on

|Fontenay-sous-Bois

Tracés 1 & 2 : risques mouvement terrain –impacts sur les habitations sur les tracés

Detailed soil and subsoil studies have been carried out concerning the risks of ground movements that could be induced by routes 1 and 2, knowing that they pass through an area (the plateau) which, to

Published on

|Fontenay-sous-Bois

Tracés 1 &amp; 2 : risques mouvement terrain –impacts sur les habitations sur les tracés

Detailed soil and subsoil studies have been carried out concerning the risks of ground movements that could be induced by routes 1 and 2, knowing that they pass through an area (the plateau) which, to

Published on

|Fontenay-sous-Bois

Tracés 1 & 2 : risques mouvement terrain –impacts sur les habitations sur les tracés

Detailed soil and subsoil studies have been carried out concerning the risks of ground movements that could be induced by routes 1 and 2, knowing that they pass through an area (the plateau) which, to

Published on

|Montreuil

ça urge !

The State must release the funds it holds to advance the work to extend the metro lines, it is up to it to finance it, it is urgent that it does so!