RedevelopmentPôle gare Le Bourget-Drancy

Opinions published

Advice received

Filters

Published on

The project|Drancy

Mon choix

I prefer scenario 1

Published on

Consultation|Drancy

Avis favorable projet scenario n°1

Offers greater flexibility

Published on

The project|Drancy

Scénario n°2

Although the two scenarios are similar, the second offers the possibility of setting up shops close to the station and the Cité du Nord, preferable to a two- or three-storey multi-storey car park. Thi

Published on

Consultation|Drancy

Réaménagement Pole-gare Le Bourget-Drancy

The project presented does not ensure free passage for all pedestrian or disabled users in the existing underpass, reserved for SNCF users, whereas this passage should be a municipal public passage, d

Published on

The project|Autre

Un projet trop routier

Both variants remain too roady in several respects: - The P+R makes no sense since arrivals in private vehicles do not really have a dedicated space at the moment (the drop-off point in front of t

Published on

Consultation|Drancy

Choix du scénario

My opinion concerns scenario n°2 (underground parking).

Published on

The project|Drancy

Places de stationnement de dépose minute souhaitées

It would be desirable for one or two drop-off parking spaces to be located near the underground tunnel providing access to the RER on Rue de la Station. This would fludify traffic, prevent anarchic s

Published on

The project|Autre

Choix pour le scénario 1

I think it would be wise to bring the car park closer to all the transport lines by installing it inside the railway tracks. The central location of the park-and-ride car park saves time for all its u

Published on

The project|Drancy

Choix de Projet

My choice falls on project 1. The cost of project 2, which is 10 million euros higher, does not bring any real "better": an underground car park is always less secure and less pleasant than an above-g

Published on

Timeline and cost|Drancy

Délais de Réalisation

The delivery times seem to be between 7 and 10 years This seems to me to be particularly long for this project that we have been waiting for 20 years.