• Home page
  • ...
    • Network Map
    • Projects and engineering works
  • Tram T12 – Massy - Évry-Courcouronnes
  • Media library
Tram

New lineMassy > Évry-Courcouronnes

Accueil

Discover the project

The route

Find out about the work

Your local agent

The tests

Media library

Legal

Media library

    • Consultation
    • Detailed studies
    • Public inquiry
    • Public meetings
    • The project timeline
    • The future T12 tram in pictures
    • A look back at the construction of the underpass in Petit Vaux
    • Go behind the scenes of the workshop-garage
    • A look back at the laying of the first rails (November 2020)
    • Live from the construction of the bridge over the RD77, in Morsang-sur-Orge
    • A look back at the development work on RER stations (summer 2020)
    • The work on the workshop-garage in pictures (summer 2018)
    • The launch of the bridges in Grigny and Ris-Orangis in pictures
    • The works in Grigny, Ris-Orangis and Morsang-sur-Orge (July 2019)
    • Work on the track beam in Massy in pictures (January 2019)
    • A look back at the open days of the construction site in Grigny (12 October 2019)
    • Works in pictures (summer 2018)
    • Live from the launch of the Évry-Courcouronnes bridge (June-July 2020)
    • The T12 tram jobs
    • Videos of the T12 tram
    • The floor of
    • Newsletters
    • Magazines
    • Pamphlets
    • Files
    • Work info
    • Press kit