Opinions published

Advice received

Published on

Contre les scenarios démesurés proposés

The proposed scenarios do not seem desirable to me. The T10 is not yet in operation: what will it be used for? The projections were made with data that was too old, a lot has changed since 2010! The

Published on

Option tunnel avec une station supplémentaire entre centre et gare

Given the narrowness of the streets concerned, the tunnel route would be the most suitable, provided that an additional station is provided halfway between Clamart-Centre and Clamart-Gare.

Published on

concertation

I would like to see the extension of the T10 tram in underground mode from the Béclère hospital to the Clamart station

Published on

Scénario de préférence

Hello, my preference is for the tunnel project. The 2 axes j. Jaurès and v. Hugo would be more than saturated with the above-ground scenario and the narrowness of its axes would make these roads unliv

Published on

Concertation T10 Choix de référence

Hello I would like to give my opinion on the T10 Tram extension project, preferring the reference choice rather than the alternative one. Less destructive to the environment, cheaper, and faster, it

Published on

Pour ce prolongement en souterrain

Hello I wanted to support this project, especially the underground route. This would make it possible to get to the heart of the city more quickly and to connect it entirely to line 15. Have a nice

Published on

Clamart

Avis complémentaire de l'Association Vivre à Clamart

Subject: Additional opinion of the association Vivre à Clamart as part of the preliminary consultation on the project to extend the T10 tramway to a station on line 15 of the GPE On the last day of

Published on

AVIS T10

I'm in favour of the T10. Living next to the Parisian garden and working in Corentin, I'm interested in this because given the number of constructions that have developed, the bus and the t6 will be o

Published on

Contribution prolongement T10

https://tram-t10-prolongement.iledefrance-mobilites.fr/wp-content/uploads/sites/126/2023/04/Contribution%20prolongement%20T10.pdf

Fichier - 707.9 KB

Published on

Penser au prolongement ultérieur vers Vanves &amp\;Issy (Celton-Val-de-Seine)

In short: We are in favour of this extension project, with a preference for the "above" option (provided that other scenarios are worked on the constrained areas), and by default for the "tunnel" opti

Fichier - 76.5 KB