Prolongement du tram ligne 10

I vote for the first tunnel route This route will not have too much impact on the environment https://tram-t10-prolongement.iledefrance-mobilites.fr/wp-content/uploads/sites/126/2023/04/IMG_20230412_

Fichier - 3.7 MB

Published on

pour un prolongement sous terrain

I am in favour of the scenario of the extension by underground road because: - the current terminus is of no interest to a Robinson Crusoe resident who wants to go to Paris easily; - the junction with

Published on

Une évidence !

The underground route is desirable Above all, no surface track that only increased traffic jams

Published on

Tram 10

Hello I am AGAINST these 2 projects to extend the T 10 finding them totally aberrant to the point of going underground first under the forest and then near the quarries which do not stop at Issy. Than

Published on

non au prolongement en souterrain tram T.10

A slightly biased consultation that presents only two options and highlights the underground one presenting it as painless since it is less visible. However, it seems to have a very high impact on the

Fichier - 1.0 MB

Published on

Non au tramway

I do not want the extension of the T10 line under Avenue Victor Hugo. I came to settle in Clamart to avoid the nuisances linked to the metro and therefore do not want to find them again (cracks and tr

Published on

Oui a un prolongement du T10!

Opening up Clamart is a necessity to allow our city to reach heavier modes of transport more easily! The city would greatly increase in attractiveness and reduce road traffic. Given the current diffic

Published on

Tunnel

I prefer the tunnel scenario which would allow me to no longer take my car to work. On the surface, the network is already very dense.

Published on

Une évolution transparente

To preserve the living environment of the people of Clamartois, I recommend the underground route which guarantees speed, environment and budget. It is by far the most ambitious project and with the b

Published on

Soutien au projet

I am entirely in favour of the T10 tram extension project.